Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Office Stairs inside The station closed 26 March

SKU: 9303047928

4.3
USD100.00 USD149.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 8 - Aug 13

Live Spec

Office Stairs inside The station closed 26 MarchConcrete stairs descend from the pay office level at Elrington Colliery to the main yard below, the same route underground workers climbed after surfacing from the Main Greta Seam, 363 metres below ground. BHP Collieries Proprietary Ltd operated the mine from 1930 until December 1962. Part of the Elrington Colliery series.

Store: bikeshow.ch · Domain: bikeshow.ch

Description

The station closed 26 March 1986 after 65 years as a pastoral terminus

This building served as the shower and change-room block where underground workers cleaned up after shifts on the Main Greta Seam

peeling paint and scattered debris across the floor

Rear Boiler House at Yarraville

faded decor peeling from walls that once served the Rozelle community

Office Stairs inside The station closed 26 MarchConcrete stairs descend from the pay office level at Elrington Colliery to the main yard below, the same route underground workers climbed after surfacing from the Main Greta Seam, 363 metres below ground. BHP Collieries Proprietary Ltd operated the mine from 1930 until December 1962. Part of the Elrington Colliery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products